Your search returned 3 results.

Sort
Results
1.
Manufacturing planning and control systems / by
Edition: 3rd ed.
Material type: Text Text
Publication details: Chicago : Irwin, c1992
Availability: Items available for loan: GIMPA Main (1)Call number: TS 176 VOL.

2.
Improving Changeover Performance : a strategy for becoming a lean, responsive manufacturer / by
Material type: Text Text
Publication details: Oxford : Butterworth-Heinemann, c2001
Availability: Items available for loan: GIMPA Main (1)Call number: TS 155.8 IMP.

3.
The fundamentals of production planning and control / by
Material type: Text Text
Publication details: Upper Saddle River, NJ : Pearson/Prentice Hall, c2006
Availability: Items available for loan: GIMPA Main (1)Call number: TS 176 CHA.

Pages

Powered by Koha